Logo Mota Engil

SCUT Concession Costa de Prata

Aveiro, Portugal
SCUT Concession Costa da Prata
Client
Ascendi Costa da Prata, Auto-Estradas da Costa da Prata, S.A.
Location
Aveiro, Portugal
Date
2002 - 2004
Status
Completed
In the SCUT Concession Costa de Prata, certain sections of the motorway, General Works, Standard and Special Engineering Structures were carried out.

Within the scope of the Costa de Prata SCUT Concession, the works set out in detail below were carried out on the following subsections of the Motorway:

- IC1 - Mira/Vagos subsection (General Works, Standard and Special Engineering Structures)

- IC1 - Vagos/Aveiro Sul subsection (General Works and Standard Engineering Structures)

- ER 1.18 - IC1/IP1 (General Works, Standard and Special Engineering Structures)

- Miramar/ER 1.18 (Standard and Special Engineering Structures)

 

IC1 - Mira/Vagos subsection (General Works, Standard and Special Engineering Structures)

General Works:

10.9Km of road with a transversal motorway profile with 2+2 lanes and a 4.1 km central reservation.

Special Engineering Structures:

Construction of 2 viaducts:

- Viaduct 1 (Total length of 364.5 m deck, construction method using prefabricated components (beams and pre-slabs);

- Viaduct 2 (Total length of 119 m, construction method using prefabricated components (beams and pre-slabs).

Standard Engineering Structures:

Construction of 12 overpasses.

 

IC1 - Vagos/Aveiro Sul subsection (General Works and Standard Engineering Structures)

General Works:

6.1 Km of road with a transversal motorway profile with 2+2 lanes and a 4.1 km central reservation.

Standard Engineering Structures:

Construction of 8 Standard Engineering Structures, consisting of 4 overpasses and 4 underpasses.

 

ER 1.18 - IC1/IP1 (General Works, Standard and Special Engineering Structures)

General Works:

4.8 Km of road with a transversal motorway profile with 2+2 lanes and a 4.1 km central reservation.

Special Engineering Structures:

Viaduct over the Ribeira de S. Lourenço, 48 m long deck using prefabricated beams.

Standard Engineering Structures:

Construction of 11 Standard Engineering Structures, consisting of 5 underpasses and 6 overpasses.

Miramar/ER 1.18 (Standard and Special Engineering Structures)

Special Engineering Structures:

Bridge over the River Canelas 60 m in length with a deck using prefabricated beams.

Standard Engineering Structures:

Construction of 3 underpasses, 2 overpasses and 2 pedestrian footbridges overpasses.

What´s next

Projects where the future takes shape