In the SCUT Concession Costa de Prata, certain sections of the motorway, General Works, and Ordinary and Special Civil Engineering Works were carried out.

Within the scope of the Costa de Prata SCUT Concession, the works set out in detail below were carried out on the following stretches of the Motorway:

- IC1 - Mira/ Vagos stretch (General works, General Infrastructure and Special Infrastructure works)

- IC1 - Vagos/ Aveiro Sul stretch (General works and Regular Infrastructure works)

- ER 1.18 - IC1/IP1 (General works and Regular and Special Infrastructure works)

- Miramar/ER 1.18 (Regular and Special Infrastructure works)

 

IC1 - Mira/ Vagos stretch (General works, Regular and Special Infrastructure works)

General works:

10,9Km of road with a transversal motorway profile with 2 + 2 lanes and a 4.1 km central reservation.

Special infrastructure works:

Construction of 2 overpasses:

- Overpass 1 (Total length of 364.5m deck, construction method using pre-fabricated components (beams and slabs);

- Overpass 2 (Total length of 119m, construction method using pre-fabricated components (beams and slabs).

Regular Infrastructure works:

Construction of 12 overpasses.

 

IC1 - Vagos/ Aveiro Sul stretch (General Works and Regular Infrastructure works)

General Works:

6,1Km of road with a transversal motorway profile with 2 + 2 lanes and a 4.1 km central reservation.

Regular Infrastructure works:

Construction of 8 General Infrastructure works consisting of 4 overpasses and 4 underpasses.

 

ER 1.18 - IC1/IP1 (General Works and Regular and Special Infrastructure works)

General Works:

4,8Km of road with a transversal motorway profile with 2 + 2 lanes and a 4.1 km central reservation.

Special Infrastructure Works:

Overpass over the Ribeira de S. Lourenço, 48m long deck using pre-fabricated beams.

Regular Infrastructure Works:

Construction of 11 Regular Infrastructure Works, comprising of 5 underpasses and 6 overpasses.

Miramar/ER 1.18 (Regular and Special Infrastructure Works)

Special Infrastructure Works:

Bridge over the River Canelas 60m in length with a deck using prefabricated beams.

Special Infrastructure Works:

Construction of 3 underpasses, 2 overpasses and 2 pedestrian footbridges overpasses.