Divor Substation

Évora, Portugal
Divor Substation
Client
REN - Rede Elétrica Nacional, S.A.
Location
Évora, Portugal
Date
2020 - 2022
Status
Completed
The new Substation, located in the municipality of Évora, is part of the National Eletricity Transmission Grid and is of notable technical and strategic complexity, given its role in the national electricity transmission grid.

The development of the project required meticulous planning and the following specific works: 

- Excavations and embankments for the construction of the substation platform (with a footprint of approximately 46,200 m²) and the access road (with a total length of 1,225 m);  

-Execution of buried structures for the foundation of electrical equipment; 

-Construction of technical buildings; 

-Paving of internal passageways and access road; 

-Construction of peripheral fencing; 

-Implementation of landscape integration. 

 

Other relevant features of the work: 

- Earthworks; 

- Drainage; 

- Paving;

- Earthing network; 

- Buildings; 

- Control centre; 

- Auxiliary services house; 

- 2 panel houses; 

- Pump room; 

- Fencing; 

- Landscaping. 