The development of the project required meticulous planning and the following specific works:
- Excavations and embankments for the construction of the substation platform (with a footprint of approximately 46,200 m²) and the access road (with a total length of 1,225 m);
-Execution of buried structures for the foundation of electrical equipment;
-Construction of technical buildings;
-Paving of internal passageways and access road;
-Construction of peripheral fencing;
-Implementation of landscape integration.
Other relevant features of the work:
- Earthworks;
- Drainage;
- Paving;
- Earthing network;
- Buildings;
- Control centre;
- Auxiliary services house;
- 2 panel houses;
- Pump room;
- Fencing;
- Landscaping.