A25 / IP5 - IC2 / Talhadas Subsection (Standard Engineering Structures and Special Engineering Structures – Bridges and Viaducts))
The Special Engineering Structures consisted of the construction of 4 viaducts:
- Viaduct V1, with a deck length of 162m, constructed using prefabricated beams and pre-slabs;
maximum span = 20m;
maximum height = 39m.
- Viaduct V2, with a deck length of 132m, constructed using prefabricated beams and pre-slabs;
maximum span = 30m;
maximum height = 26m.
- Viaduct V3, with a deck length of 258m, constructed using launching gantries;
maximum span = 80m;
maximum height = 16m.
Standard Engineering Structures:
1 Overpass and 8 Underpasses.
A25/IP5 - Talhadas / Vouzela (General Works)
17.1 km of roadway with a cross-section featuring 2+2 lanes and a wide central reservation.
A25 / IP5 - Vouzela / Boa Aldeia (General Works and Special Engineering Structures)
General Works:
11,6 km of roadway with a cross-section featuring 2+2 lanes and a wide central reservation.
Special Engineering Structures:
These works involved the construction of 4 viaducts:
- Viaduct V1 - with a deck length of 230m, constructed using a launching girder;
maximum span = 40m;
maximum height = 38m.
- Viaduct V2 - with a deck length of 240m, constructed using a launching girder;
maximum span = 40m;
maximum height = 44m.
- Viaduct V3 - with a deck length of 221.2m, constructed using a launching girder;
maximum span = 39.5m;
maximum height = 44m.
- Viaduct V4 - with a deck length of 260,7m, constructed using a launching girder;
maximum span = 39.5m;
maximum height = 48m.
A25 / IP5 - Boa Aldeia Junction Subsection - IP3 / IP5 West and IP3 / IP5 North (Special Engineering Structures)
The Special Engineering Structures consisted of the construction of 5 viaducts:
- Viaduct V1 – features 2 decks of 180m, constructed using ground-based falsework.
maximum span = 32.5m;
maximum height = 24m.
- Viaduct V2 – features 2 decks of 286m, constructed using prefabricated I-beams.
maximum span = 26m;
maximum height = 17m.
- Viaduct V3 – features 2 decks of 335m, constructed using prefabricated box girders.
maximum span = 30m;
maximum height = 29m.
- Viaduct V4 – features 2 decks, constructed using prefabricated box girders:
363m-long North Viaduct and 353m-long South Viaduct
maximum height = 26m;
maximum span = 30m;
maximum height = 28m.
- Viaduct V1A – features a 280m-long and 30m-wide deck, constructed using prefabricated I-beams.
maximum span = 23m;
maximum height = 19m.
A25 / IP5 – Mangualde / Fornos de Algodres (Special Engineering Structures)
The contract involved the construction of 4 Special Engineering Structures (Viaducts):
- Viaduct V4 - total length of 292m, consisting of 2 independent decks built using prefabricated I-beams and pre-slabs serving as formwork for the deck slab to be cast in situ.
maximum span = 20m;
maximum height = 18m.
- Viaduct V5 - total length of 444m, consisting of 2 independent decks built using prefabricated U-beams and pre-slabs serving as formwork for the deck slab to be cast in situ.
maximum span = 30m;
maximum height = 36m.
- Viaduct V6 - total length of 504m, consisting of 2 independent decks built using prefabricated U-beams and pre-slabs serving as formwork for the deck slab to be cast in situ.
maximum span = 40m;
maximum height = 63m.
- Viaduct V7 - total length of 443m, consisting of 2 independent decks built using lower launching girder:
maximum span = 41m;
maximum height = 30m.
A25 / IP5 – Fornos de Algodres / Ratoeira East (Standard Engineering Structures and Special Engineering Structures)
The contract involved the construction of 5 Special Engineering Structures (Viaducts) and 7 Standard Engineering Structures (3 underpasses and 4 overpasses).
The Special Engineering Structures consisted of the construction of 5 viaducts built using ground-based falsework:
- Viaduct V1 - Deck length of 122m.
maximum span = 26m;
maximum height = 18m.
- Viaduct V2 - Deck length of 73.62m.
maximum span = 22m;
maximum height = 14m.
- Viaduct V3 - Deck length of 102.26m.
maximum span = 30m;
maximum height = 17m.
- Viaduct V4 - Deck length of 167.66m.
maximum span = 25.4m;
maximum height = 20m.
- Viaduct V5 - Deck length of 144m.
maximum span = 30m;
maximum height = 15m.
Standard Engineering Structures:
3 Underpasses and 4 Overpasses.
A25 / IP5 – Ratoeira East / IP2 South (General Works)
General Works:
17.3 km long motorway section featuring 2+2 lanes and a wide central reservation (4.1 m).