Client: Sines Port Administration
Project: Underground excavation: Terminal XXI Expansion - PSA Sines - Phase 1 and 2 (Port Works)
Description: Following on from the 1st phase, work was carried out on the Sines quarry (owned by the Sines Port Authority) over a period of 8 months. The work consisted of dismantling, loading/sorting and transporting rockfill, with average monthly yields of 650,000 tonnes (total volume of 5Mt).