Client: Ute renedo guarnizo (comsa + cycasa) | Adif
Project: Doubling of the Renedo-Guarnizo section and other work on the c-1 railway line between Torrelavega and Renedo
Description: Execution of foundation piles using 1500 and 1200mm diameter recoverable pipes in the execution of a containment of a moving slope to contain the existing railway tracks, executing piles to a depth of 45ml.