Lisbon Metro - Yellow and Green Line

Lisbon Metro - Yellow and Green Line

Client: Metropolitano de Lisboa, E.P.E

Project: Lisbon Metro - Yellow and Green Line (Lot 2)

Description: For the work to extend these lines, the Special Foundations area carried out a number of works, in particular:

- Execution of the boreholes in the section between Santos and Cais do Sodré stations;

- Execution of the moulded retaining wall for the tunnel excavation, 0.60m and 0.80m thick and an average length of 24m (12.400 m2);

- Ø1000mm piles for the containment of the excavation of the Santos station shaft (5933m);

- 600kN anchorage systems in the beam of the Santos station shaft pile curtain (2018m);

- Ø800mm containment piles for the excavation of the accesses to Santos station and the tunnel (4280m);

- Ø800mm containment piles for the excavation of the trench between Av. D. Carlos I (3307m);

- Ø127 micropiles for reinforcing the foundations of buildings adjacent to Santos station (5082.23m);

- Ø244 containment micropiles for excavating the CP - APL access and Lisbon Harbour Beltway (1957m).