Client: Infraestruturas de Portugal, S.A.
Project: Bridge over the Ceira River and Access Viaducts
Description: The Bridge over the Ceira River, which is part of the A13 Motorway, features a main span of 250m, standing at 140m-high above the riverbed. Some 2000 tonnes of prestressed steel were used in its construction.