Client: UTE Sierrapando (vias + siec)
Project: A67-Meseta motorway - Sierrapando-Barreda continuity branch and improvement of the Sierrapando, Barreda and Torrelavega links
Description: Construction of foundation piles using recoverable pipes with diameters of 1500, 1200, 1000, 800 and 650mm for the foundations of all the structures to improve the connection between the A67 and A8 motorways in Torrelavega.